Text

The current construction project `Pool out of the box‘ will be the first stop of the two-day IAKS Pool Study Tour from 26-27 October 2025. The study tour will take place in the run-up to the aquanale trade fair - the No. 1 meeting place for the international swimming pool and wellness industry. Fostering innovations for a conscious lifestyle centred around health, wellness and exercise, the aquanale trade fair will take place in Cologne, Germany from 28-31 October 2025.

Dive deep into 'pool out of the box'. Here's why:

The modular wooden design and the pool’s almost complete prefabrication in the factory make it possible to erect it at different locations, dismantle it, relocate it and re-erect it – and all in a short time. The compact building has two floors: the pool entrance, plant and staff rooms are on the ground floor. The upper floor houses the pool hall with the changing rooms and sanitary facilities. The pool hall accommodates a 25- metre stainless steel pool with five lanes and a partially movable floor. This makes it possible for use by several school classes at the same time. The interior finish, furnishings and equipment for the various modular rooms are also prefabricated in the factory and interconnected via interfaces on site.   

Preview image
Bild
Modulares Hallenbad Stuttgart_Badehalle (c) POOL out of the BOX GmbH - 4a Architekten_650_650.jpg

(c) Pool out of the Box GmbH - 4a Architekten