Built within 14 months by turnkey provider NUSSLI
Author: Marike van der Ben, NÜSSLI Group, www.nussli.com
Sports fans, culture lovers, and visitors to events in Nuremberg, Germany have been looking forward to this for a long time: After construction works lasting around a year, the hall at Tillypark has been available for sports and cultural events with up to 4,000 spectators since August. As a turnkey provider, NUSSLI was responsible for the entire large-scale project, including planning services on the 25,000 m² site.
The event hall with a building area of 91 by 55 m and grandstands installed on all sides can accommodate up to 4,000 persons. One of them is a telescopic standing grandstand and can be retracted if required. This creates space that can be used for a stage at a concert or larger gatherings.
Built within 14 months
The team from NUSSLI Germany fulfilled the City of Nuremberg‘s requirement for a multifunctional hall that was both functional and suitable for a wide range of sports, yet affordable and quick to build, and constructed it within 14 months. With its „chameleon façade“ made of green and brown slats and the large glass front, the exterior of the hall looks premium and modern.

photo: Manfred Jahreiss