From Olympic stage to community pool
Advert by IAKS member Myrtha Pools
When the crowds cheered their last roar at Paris La Défense Arena back in summer 2024, the story of two extraordinary Myrtha pools was far from being over. In fact, it was just beginning. Nearly two years from then, the legacy promise made before the first stroke was ever swum is materialising – pool by pool, community by community – across the greater Paris metropolitan area.
The plan was bold from the outset. Myrtha Pools, the aquatic engineering company behind the Arena‘s two temporary 50-m competition and warm-up pools, had designed both structures with post-Games reinstallation in mind from day one. That commitment to circular thinking is now delivering tangible results in Sevran, Bagnolet, and in Lille. A development, especially in the last case, that extends the legacy story beyond its original scope.
© Myrtha Pools