Slider responsive

New Heidbergbad swimming pool in Braunschweig

featured in sb magazine 3/2022
Order your copy

Five starting blocks and four lanes

published in sb magazine 3/2022

 

The new building of the Heidbergbad swimming pool in the south of Braunschweig not only replaces the old indoor swimming pool, but also helps to extend the facility‘s ­service life, reduce energy costs and spruce up the bathing opportunities of the city in eastern Lower Saxony with its population of just under 250,000. The architects pbr have fused the new and existing buildings into a single ensemble.

The Heidbergbad built in 1973 is the most recent and most varied of the pools belonging to „Eu­ropabad“ series in Braunschweig. The term ­„Europabad“ denotes not an inflexible ground plan, but rather a combination of cost-saving ideas.

Old and new become one
A single-storey structure with a basement for plant, the new building has been erected right up against the competition pool built in 1993. The new foyer has the same height as the competition pool and thus blends in perfectly with the local situation. In the design of the façade, importance has been attached to merging the new building and the existing structure into a single entity.

Heidbergbad

Photo: Christian Bierwagen

Good to know

Heidbergbad Plan

Photo: pbr Planungsbüro Rohling AG

Location
Braunschweig, Germany

Client / operator
Stadtbad Braunschweig Sport und Freizeit GmbH

Architects
pbr Planungsbüro Rohling AG
Architekten Ingenieure
DE – 49076 Osnabrück
www.pbr.de

Author
Frauke Stroman

Photos
Christian Bierwagen

Official opening
March 2021

Construction costs
EUR 10.6 million

Curious? Read the full feature now.

Go to article

Prefer to have your own copy? Subscribe to the sb magazine - and you receive all six issues per year

More info on ordering and subscribing