Cotenda supplies products proven to increase participation in sport and activity.
Winning a design competition for the London 2012 Olympics launched their ‘Poolpod’ platform lift, now enabling independent swimming in 500+ pools, across five continents.
In-depth stakeholder input added unique features to their new model, Poolpod 3.0. The latest model includes two built-in seats enabling care-givers to accompany users into the pool, rapid portability allowing pools to reconfigure the water-space, electronic operation with manual backup handle in the event of failure, industry-leading safety features, and much more.
Ships assembled, installed in any pool in ~ 4 hours.
